عن Ahmed Gamal Eldin:
I used to work in a start up company in the Biogas field, I am one of the first assigned employees. that was a positive point to my career, I received the equipment, Installed them, I was accompanied with foreigners international technicians for commissioning process, I started the operation, I studied all manual handbooks for the equipment so I can prepare the checklists, daily, weekly, monthly, .. etc. also upon my study I prepared all the spare parts, tools, and materials which I will be in need for the first two years, associated with a budget for them. Now I have four years of experience, but actually they are more.
Anaerobic digestation biogas plants
الخبرة
Biogas plant manager
Empower NRE | September 2017 - present
- Responsible for applying all safety precautions.
- Supervision and installation for (Double membranes, Agitators,
Submerged mixer, pumps, plumbing, dehumidifier, desulphurization
systems biological or air injection, flare, and CHP).
- Commission plant mechanically, electrically and biologically.
- Operate the plant via SCADA (PLC) systems. and maintain minor and major
repairs (overhaul) ,
- Operating the Anaerobic digestion process, follow up FOS/TAC ratio.
- Operating, following up and recording checklists (daily, weekly, monthly),
- Feedstock control.
- Prepare spare parts stock to be always ready.
- Contact suppliers for warranty claims, ordering spare parts, and for
technical supports.
التعليم
Bachelor in Mechanical Engineering